Project Purpose: To transport crude oil from Uganda’s oil fields in the Lake Albert region (Tilenga and Kingfisher projects) to the Tanzanian port of Tanga for export.
Total Length: 1,443 km (296 km in Uganda, 1,147 km in Tanzania).
Capacity: 246,000 barrels per day.
Pipeline Diameter: 24 inches, fully buried and insulated.
Construction Model: Built, owned, and operated by EACOP Ltd, a company owned by:
TotalEnergies – 62%
Uganda National Oil Company (UNOC) – 15%
Tanzania Petroleum Development Corporation (TPDC) – 15%
CNOOC Uganda – 8%
Starting Point: Kabaale, Hoima (Uganda).
End Point: Chongoleani Peninsula, near Tanga Port (Tanzania).
Thermal Maintenance: Oil is kept above 50°C using trace heating due to its physical properties.
Power Supply:
Uganda: Surplus power from Tilenga/Kingfisher & national grid.
Tanzania: Onsite generation with 5 solar farms (90MWp total) and future grid connection.
Control & Monitoring:
24/7 control rooms at both ends.
Fibre-optic cable for data transmission, temperature, and vibration monitoring.
76 remotely controlled block valves for emergency isolation.
Periodic intelligent pigging for wall thickness and integrity checks.
Hydrotesting at 1.25x pressure before commissioning.
6 Pumping Stations: 2 in Uganda, 4 in Tanzania.
2 Pressure Reduction Stations.
Marine Storage & Load-out Terminal: Located at Tanga Bay with jetty access to 23m water depth.
Fibre-Optic Infrastructure: Enhances regional internet connectivity potential.
Intergovernmental Agreement (IGA): Uganda & Tanzania, signed May 26, 2017.
Host Government Agreements (HGA):
Uganda: April 11, 2021
Tanzania: May 20, 2021
EACOP Shareholders Agreement: Effective from February 15, 2022.
Transport and Tariff Agreement (TTA): Defines oil custody and EACOP income structure.
Land Acquisition: Final 30m right-of-way determined after 2016–2018 surveys and assessments.
Resettlement & Livelihood Restoration: Programs in place for affected communities.
Environmental and Social Impact: Multiple studies completed; includes biodiversity and vulnerable ethnic group considerations.
Human Rights Commitments: Incorporated into operational standards.